Skip to main content

Hampstead & North London · In-house delivery

House Extension in North & North West London — Rear, Side-Return & Wraparound

House extensions across Hampstead and London — rear, side-return and wraparound forms with planning, structure and build coordinated in-house.

House extension briefs cover rear, side and wraparound additions for terraces, semis and larger homes. Design input, planning path, structural works, waterproof junctions, services and finishes are sequenced in one written programme — not a marketplace of disconnected traders.

  • House Extension
  • Rear Extension
  • Side Return Extension
  • Wraparound Extension
  • Kitchen Extension
  • Single Storey Extension
  • Double Storey Extension
  • Extension Planning Permission

Covering 47 London areas

What do you need?

Choose the job. Each one says what to send, and whether to call.

  • A rear or side extension

    Photograph the garden elevation and say whether the house is a flat.

    Send this in a brief
  • Planning and the build

    Send any drawings you already have. Consent stays with the authority.

    Send this in a brief

Frame the extension around household use and the existing plan

A house-extension brief should explain what the existing home cannot do and how the proposed space should connect to it. A rear family room, side-return kitchen, utility addition, accessible room or two-storey enlargement creates different daylight, circulation, privacy, service and structural questions. Mark which walls and rooms may change, how the garden should be reached and whether the home remains occupied. “Wraparound” or “rear extension” describes a form, not an evidenced design. The first output should be a clear brief and feasibility route rather than an assumed footprint or generic square-metre price.

Survey boundaries, levels, structure and buried constraints

Measured information should cover the house, previous additions, plot boundaries, ground and threshold levels, drainage points, trees, visible services, neighbouring buildings and construction access. Existing drawings, title information, planning history, surveys and service records should be assembled where held. A photograph cannot establish boundary ownership, foundation condition, drain ownership or ground bearing capacity. The designer and relevant specialists should identify what further investigation is proportionate before foundations, openings or drainage diversions are fixed. Unknowns belong in the survey plan and quote assumptions, not in confident marketing language.

Determine planning status from the complete proposal

Some house enlargements can fall within permitted-development rights in England, but only where all current conditions, limitations and cumulative-development tests are satisfied. Government technical guidance also explains that these rights do not remove other consent regimes and do not apply in every property context. Previous extensions, original-house interpretation, designated-land rules, removed rights and the relationship between rear, side and roof work can change the answer. The relevant authority or appointed planning professional should assess the exact design and address; an area hub cannot grant permission or declare an application unnecessary.

Coordinate foundations, openings and the retained building

The structural package should address the proposed foundations, ground conditions, nearby structures and drains, new walls and roof, lateral stability and openings through the existing house. Temporary support and the sequence for forming an opening matter as much as the final beam. Most extensions require Building Regulations approval, and the control route should be agreed before controlled work starts. Calculations, details and inspection stages need to align with the architectural design. A structural allowance without defined bearings, supports, fire protection and making good is not a complete construction scope.

Design drainage, thresholds and weatherproof junctions early

An extension changes roof runoff, external ground, thresholds and sometimes foul or surface-water routes. Kitchen, utility or bathroom layouts can add new drainage demand and coordination. Existing drains may cross the proposed footprint or involve a water-company or other approval route, but ownership and condition must be checked rather than assumed. The package should show roof drainage, waterproof junctions, damp protection, finished levels and how the new envelope meets the retained building. Delaying these decisions until groundworks or roofing makes avoidable changes more likely and can compromise access for inspection.

Treat boundaries and party-wall procedure as owner matters

Building on or near a boundary, working on a party structure or excavating near a neighbouring building can engage the Party Wall etc. Act. Government guidance describes this as a separate legal framework from planning and Building Regulations. The proposed foundations, wall position and structural openings need enough definition for the relevant owners and advisers to decide what procedure applies. A neighbour’s informal support is not the same as every required notice or consent, while a party-wall award does not determine the planning application. Responsibilities and lead times should be visible in the programme.

Plan an occupied-home project and its construction duties

Access, protection, temporary security, dust separation, utilities, deliveries, waste and welfare arrangements shape whether the house can remain occupied during work. Under CDM 2015, HSE explains how domestic-client duties normally pass to the contractor on a single-contractor project or the principal contractor where more than one contractor is involved, unless the permitted written arrangement applies. The project team and roles should be named rather than implied. A construction phase plan, site controls and realistic sequencing are part of delivery; a polished design alone does not manage safety or household disruption.

Price and hand over the accepted extension package

A useful proposal distinguishes design and professional fees, applications, investigations, structural work, groundworks, drainage, envelope, scaffold or access, services, finishes, protection, waste, allowances and exclusions. It should state which decisions remain provisional and how changes are approved before extra work proceeds. Programme milestones normally depend on design, consent, neighbour procedure, procurement, opening-up and inspections, so a fixed completion promise is not justified before those facts are known. Handover should assemble the agreed drawings, calculations, approvals, inspection evidence, product information, commissioning records and a written snagging status.

Why Choose Hampstead On Demand?

  • ✓Reviewed by the operating team, not a provider marketplace
  • ✓The price basis is confirmed before planned work
  • ✓A written quote or confirmed call-out terms before work
  • ✓Postcode and property details considered during triage
  • ✓Relevant trade credentials checked before work

House-extension design brief

  • Full address, property type, tenure and household outcome
  • Measured plans, title information, surveys and planning history if held
  • Previous extensions and all proposed rear, side and roof changes
  • Boundary, level, tree, drainage and visible-service information
  • Rooms, openings, kitchens, bathrooms and service changes required
  • Preferred materials and relationship with the retained house
  • Neighbour, party-wall, freeholder or estate constraints
  • Occupancy, access, security and programme dependencies

Extension readiness and quote checks

  • Has the complete proposal been tested against the address-specific planning route?
  • What surveys and investigations remain before structural design?
  • Which Building Regulations approval and inspection route applies?
  • How are boundaries, party structures, foundations and drains handled?
  • Who holds the designer, contractor and CDM responsibilities?
  • Which costs are fixed, allowed, excluded or subject to opening-up?
  • What approval, commissioning and completion evidence is expected?

Independent guidance relevant to this brief

These external sources explain safety, regulatory or consumer context. They do not confirm availability, diagnose the property or replace job-specific professional advice.

  • Planning Portal: extension planning permission

    Introductory guidance on England’s permitted-development limits and when a householder planning route may be needed.

  • Planning Portal: extension Building Regulations

    Guidance on approval and the building elements commonly considered for an extension.

  • GOV.UK: householder permitted-development guidance

    Government technical guidance on interpreting permitted-development rights for house enlargements and roof work.

  • HSE: domestic construction clients

    Official guidance on how CDM 2015 duties normally pass and how project roles are allocated for domestic work.

Local decision context

House Extension briefs in North & North West London

Read the local property and access context for your brief. Availability is confirmed after we review the postcode and job details.

Featured house extension neighbourhoods

Choose the page for your exact neighbourhood where one exists. Availability is always confirmed from your postcode.

Local service coverage

House Extension by area

All house extension neighbourhood links are shown in the priority or featured section above. They are not repeated here.

  • North & North West London
  • Central London
  • West London
  • South West London
  • South London
  • South East London
  • East London

To discuss work, start a project brief with photos and details.

No duplicate area links are shown here. Use the priority or featured neighbourhood links above, or submit the exact postcode for a case-by-case capacity check.

Other neighbourhoods can still receive a brief through the portal; dedicated pages are added as our coverage there grows.

Looking for another postcode? Browse all areas or use the coverage checker.

Frequently Asked Questions

How do I ask for a house extension?▼
Use the online form or call 020 7101 3168. Include the postcode, a clear description of the issue or project, photographs where helpful, and access notes. Submission starts a review — it is not a confirmed booking.
Where can I ask for a house extension?▼
You may submit for Hampstead, North West London and wider London postcodes. Dedicated pages currently focus on neighbourhoods such as Hampstead, Hampstead Village, Belsize Park, St John's Wood and West Hampstead, with other postcodes reviewed case by case. Coverage and timing are confirmed after the location and scope have been reviewed — not solely because an area page exists.
Who carries out the work?▼
Accepted work goes to Hampstead Renovations or Hampstead Maintenance. We name the skill, registration and insurance the job needs before work starts.
How is the price agreed?▼
The price depends on access, the condition of the building, materials, programme and any approvals needed. Where we can quote, the written document states inclusions, assumptions, exclusions and payment terms. Smaller completed jobs are paid by bank transfer after completion; larger works use the deposit and final terms in the accepted quote.
Do I need a visit before you can quote?▼
Not always. Clear photographs and a written description can be enough for straightforward scopes. Complex fabric, structural openings, concealed services or unclear access usually need a visit before a safe price basis can be written.
What should I send about a flat or a managed building?▼
For flats and mansion blocks, attach any licence-to-alter, working-hours note, riser plan or managing-agent rules you already hold. Lift size, porter rules and communal corridor protection often affect how house extension attendance is programmed. Freeholder approval is never invented from a neighbourhood page alone — those facts come from the property documents and the accepted written scope.
Does this work need Building Control?▼
Not always. Whether approval or a competent-person route is needed depends on the defined work and property. Openings, structural alterations, drainage changes and certain electrical or heating works are more likely to need one of those routes. We flag known compliance questions in triage. A service hub does not predict a notification outcome from a neighbourhood page. Attach any existing notice or completion certificate you hold.
Can I submit a house extension brief in London?▼
Yes. Send the postcode and job details for review. Submission is not a booking; we confirm whether the brief fits, current availability and the next step.
How is house extension work priced?▼
The price depends on the accepted scope, access, timing, materials and any assessment required. We confirm a written quote or other agreed price basis before planned work starts.
Do I need planning permission for a house extension in London?▼
It depends on design, previous alterations, designation and current local and national rules — including whether permitted development still applies. We confirm the assessment path for the specific property; formal decisions remain with the local planning authority.
How much does a house extension cost in London?▼
Cost depends on footprint, glazing, structural complexity, ground conditions, specification and whether a full kitchen fit-out is included. Pricing follows the accepted written scope, not a postcode rate card.
Can you build a side-return or wraparound extension in London?▼
Yes, where the host house, garden and neighbours allow. Side-return and wraparound forms need careful structure, drainage and light assessment. Photographs of the rear and side elevations help triage before design lock.
Does a house extension in London need a party wall agreement?▼
Works to shared walls or excavations near a boundary may engage the Party Wall etc. Act 1996. Not every extension is a party-wall matter — formal notices and awards remain with the building owner and appointed surveyors.

More topics: all FAQs · quotes & payments · service areas · renovations

Related Services

How the brief works

1

Tell us what you need

Describe your project or issue using our online form or by phone.

2

Receive a quote

We review the request and respond with clear pricing or the next step.

3

Agree the next step

We confirm availability and agree any visit or work date with you.

4

Work delivered

Job-specific qualifications, registrations and insurance are confirmed first.

5

Follow-up

Workmanship has 12-month cover, subject to the published terms.

People Also Ask About House Extension

Can permitted development rights for an extension be taken away?▼

Yes. Permitted development rights are a national grant of planning permission, and GOV.UK confirms that an article 4 direction enables the Secretary of State or the local planning authority to withdraw specified permitted development rights across a defined area, so a planning application is then needed. Whether a direction covers a particular property is address-specific and must be checked on the council's own records.

Source: When is permission required? Planning Practice Guidance, GOV.UK

Do I need a party wall notice to build into a shared wall?▼

Yes. Section 3 of the Party Wall etc. Act 1996 requires a building owner to serve a party structure notice on the adjoining owner before exercising any right conferred by section 2, which includes work to a shared wall. The notice must state the building owner's name and address, the nature and particulars of the proposed work and the start date, and be served at least two months before work begins.

Source: Party Wall etc. Act 1996, section 3, legislation.gov.uk

Do I need to notify my neighbour before digging extension foundations?▼

Yes, where the excavation is close and deep enough to engage section 6 of the Party Wall etc. Act 1996. That applies within three metres of a neighbouring building or structure where the excavation goes below the level of their foundations, or within six metres where it cuts a plane drawn downwards at 45 degrees from their foundations. Notice is required at least one month before excavating.

Source: Party Wall etc. Act 1996, section 6, legislation.gov.uk

Does a house extension need building regulations approval?▼

In most cases yes. The Planning Portal states that most extensions of a property require approval under the Building Regulations, with guidance covering foundations, structural openings, walls below ground level, drainage, ventilation and energy efficiency. A number of classes of new building or extension are exempt. Building regulations approval is separate from planning permission, so holding one does not remove the need for the other; whether permission is needed depends on the specific address and is confirmed with the local planning authority.

Source: Is building regulations approval needed for an extension? Planning Portal

How far can a rear extension go without planning permission?▼

In England, permitted development allows a single-storey rear extension to project up to three metres beyond the rear wall of the original house, or four metres for a detached house, and it must not exceed four metres in height. Deeper extensions need prior approval. Rights are restricted on Article 2(3) designated land such as conservation areas, so the position for a specific address must be confirmed with the local planning authority.

Source: Extensions: Planning Permission, Planning Portal

How much of my garden can I build on under permitted development?▼

Only half the area of land around the original house may be covered by extensions and other buildings under permitted development. A side extension is also limited to no more than half the width of the original house. These allowances apply in England and are restricted on Article 2(3) designated land, so the position for a specific address must be confirmed with the local planning authority.

Source: Extensions: Planning Permission, Planning Portal

What is the larger home extension prior approval scheme?▼

It permits a deeper single-storey rear extension in England, subject to a prior approval notification. The limits rise to over four and up to eight metres for a detached house, and over three and up to six metres for any other house. The householder applies to the local planning authority, which consults adjoining neighbours; if they object, the authority decides whether the impact on their amenity is acceptable.

Source: Extensions: Prior approval, Planning Portal

House Extension Guides & Resources

In-depth reading

Brief our team about house extension

Send the address, the trade and what you need done. The team confirms availability and the next step from the office at 250 Finchley Road.

Delivered in-house by Hampstead Maintenance or Hampstead Renovations (£5M public liability, £10M employers' liability & contractors' all risks cover). Never a third-party lead marketplace. For urgent gas leaks call 0800 111 999 first; for urgent make-safe triage call 020 7101 3168.

Need help with a property?

Submit a one-time request in the browser. Install the app later if you want easier repeat requests and tracking.