Hampstead & North London · In-house delivery
House Extension in Hampstead & NW London — Rear, Side-Return & Wraparound
House extensions across Hampstead and London — rear, side-return and wraparound forms with planning, structure and build coordinated in-house.
House extension briefs cover rear, side and wraparound additions for terraces, semis and larger homes. Design input, planning path, structural works, waterproof junctions, services and finishes are sequenced in one written programme — not a marketplace of disconnected traders.
- House Extension
- Rear Extension
- Side Return Extension
- Wraparound Extension
- Kitchen Extension
- Single Storey Extension
- Double Storey Extension
- Extension Planning Permission
Covering 224 London neighbourhoods
Local decision context
House Extension briefs in priority London areas
Each link opens the dedicated service page for that neighbourhood, with local property and access context. Availability is confirmed after we review the postcode and brief.
Featured house extension neighbourhoods
Choose the page for your exact neighbourhood where one exists. Availability is always confirmed from your postcode.
Local service coverage
House Extension by area
Browse dedicated house extension pages for every area we list. Availability is confirmed after reviewing the postcode and brief.
To discuss work, start a project brief with photos and details — this portal is not a photo portfolio.
E1
E14
E8
N4
NW10
SE1
SE11
SE13
SE21
SW1
SW11
SW17
SW18
SW19
SW6
SW7
SW8
TW9
W1
W11
W2
WC1
Looking for another postcode? Browse all areas or use the coverage checker.
Why Choose Hampstead On Demand?
- ✓Reviewed by the operating team, not a provider marketplace
- ✓The price basis is confirmed before planned work
- ✓A written quote or confirmed call-out terms before work
- ✓Postcode and property details considered during triage
- ✓Relevant trade credentials checked before work
Frame the extension around household use and the existing plan
A house-extension brief should explain what the existing home cannot do and how the proposed space should connect to it. A rear family room, side-return kitchen, utility addition, accessible room or two-storey enlargement creates different daylight, circulation, privacy, service and structural questions. Mark which walls and rooms may change, how the garden should be reached and whether the home remains occupied. “Wraparound” or “rear extension” describes a form, not an evidenced design. The first output should be a clear brief and feasibility route rather than an assumed footprint or generic square-metre price.
Survey boundaries, levels, structure and buried constraints
Measured information should cover the house, previous additions, plot boundaries, ground and threshold levels, drainage points, trees, visible services, neighbouring buildings and construction access. Existing drawings, title information, planning history, surveys and service records should be assembled where held. A photograph cannot establish boundary ownership, foundation condition, drain ownership or ground bearing capacity. The designer and relevant specialists should identify what further investigation is proportionate before foundations, openings or drainage diversions are fixed. Unknowns belong in the survey plan and quote assumptions, not in confident marketing language.
Determine planning status from the complete proposal
Some house enlargements can fall within permitted-development rights in England, but only where all current conditions, limitations and cumulative-development tests are satisfied. Government technical guidance also explains that these rights do not remove other consent regimes and do not apply in every property context. Previous extensions, original-house interpretation, designated-land rules, removed rights and the relationship between rear, side and roof work can change the answer. The relevant authority or appointed planning professional should assess the exact design and address; an area hub cannot grant permission or declare an application unnecessary.
Coordinate foundations, openings and the retained building
The structural package should address the proposed foundations, ground conditions, nearby structures and drains, new walls and roof, lateral stability and openings through the existing house. Temporary support and the sequence for forming an opening matter as much as the final beam. Most extensions require Building Regulations approval, and the control route should be agreed before controlled work starts. Calculations, details and inspection stages need to align with the architectural design. A structural allowance without defined bearings, supports, fire protection and making good is not a complete construction scope.
Design drainage, thresholds and weatherproof junctions early
An extension changes roof runoff, external ground, thresholds and sometimes foul or surface-water routes. Kitchen, utility or bathroom layouts can add new drainage demand and coordination. Existing drains may cross the proposed footprint or involve a water-company or other approval route, but ownership and condition must be checked rather than assumed. The package should show roof drainage, waterproof junctions, damp protection, finished levels and how the new envelope meets the retained building. Delaying these decisions until groundworks or roofing makes avoidable changes more likely and can compromise access for inspection.
Treat boundaries and party-wall procedure as owner matters
Building on or near a boundary, working on a party structure or excavating near a neighbouring building can engage the Party Wall etc. Act. Government guidance describes this as a separate legal framework from planning and Building Regulations. The proposed foundations, wall position and structural openings need enough definition for the relevant owners and advisers to decide what procedure applies. A neighbour’s informal support is not the same as every required notice or consent, while a party-wall award does not determine the planning application. Responsibilities and lead times should be visible in the programme.
Plan an occupied-home project and its construction duties
Access, protection, temporary security, dust separation, utilities, deliveries, waste and welfare arrangements shape whether the house can remain occupied during work. Under CDM 2015, HSE explains how domestic-client duties normally pass to the contractor on a single-contractor project or the principal contractor where more than one contractor is involved, unless the permitted written arrangement applies. The project team and roles should be named rather than implied. A construction phase plan, site controls and realistic sequencing are part of delivery; a polished design alone does not manage safety or household disruption.
Price and hand over the accepted extension package
A useful proposal distinguishes design and professional fees, applications, investigations, structural work, groundworks, drainage, envelope, scaffold or access, services, finishes, protection, waste, allowances and exclusions. It should state which decisions remain provisional and how changes are approved before extra work proceeds. Programme milestones normally depend on design, consent, neighbour procedure, procurement, opening-up and inspections, so a fixed completion promise is not justified before those facts are known. Handover should assemble the agreed drawings, calculations, approvals, inspection evidence, product information, commissioning records and a written snagging status.
Independent guidance relevant to this brief
These external sources explain safety, regulatory or consumer context. They do not confirm availability, diagnose the property or replace job-specific professional advice.
- Planning Portal: extension planning permission
Introductory guidance on England’s permitted-development limits and when a householder planning route may be needed.
- Planning Portal: extension Building Regulations
Guidance on approval and the building elements commonly considered for an extension.
- GOV.UK: householder permitted-development guidance
Government technical guidance on interpreting permitted-development rights for house enlargements and roof work.
- HSE: domestic construction clients
Official guidance on how CDM 2015 duties normally pass and how project roles are allocated for domestic work.
House-extension design brief
- Full address, property type, tenure and household outcome
- Measured plans, title information, surveys and planning history if held
- Previous extensions and all proposed rear, side and roof changes
- Boundary, level, tree, drainage and visible-service information
- Rooms, openings, kitchens, bathrooms and service changes required
- Preferred materials and relationship with the retained house
- Neighbour, party-wall, freeholder or estate constraints
- Occupancy, access, security and programme dependencies
Extension readiness and quote checks
- Has the complete proposal been tested against the address-specific planning route?
- What surveys and investigations remain before structural design?
- Which Building Regulations approval and inspection route applies?
- How are boundaries, party structures, foundations and drains handled?
- Who holds the designer, contractor and CDM responsibilities?
- Which costs are fixed, allowed, excluded or subject to opening-up?
- What approval, commissioning and completion evidence is expected?
Frequently Asked Questions
How do I start a house extension brief?▼
Where do you accept house extension briefs?▼
Is House Extension delivered by third-party traders?▼
How is house extension pricing confirmed?▼
Do I always need a site visit for house extension?▼
What house extension themes do people commonly brief?▼
What freeholder or building access notes help for a house extension brief?▼
Does a house extension brief always need Building Control?▼
Can I submit a house extension brief in London?▼
How is house extension work priced?▼
Do I need planning permission for a house extension in London?▼
How much does a house extension cost in London?▼
Can you build a side-return or wraparound extension in London?▼
Does a house extension in London need a party wall agreement?▼
More topics: all FAQs · quotes & payments · service areas · renovations
Related Services
Loft Conversion
Loft conversions across Hampstead and London — dormer, rooflight and mansard forms with planning, structure and build coordinated in-house.
Basement Conversion
Basement and cellar conversions across Hampstead and London — structure, waterproofing and fit-out after assessment.
Full Refurbishment
House refurbishment and full property renovation across Hampstead and London — strip-out to fit-out with all trades coordinated in-house.
Kitchen Renovation
Kitchen renovation and kitchen refurbishment across Hampstead and London — joinery, worktops, plumbing, electrics and finishes coordinated in-house.
How the brief works
Tell us what you need
Describe your project or issue using our online form or by phone.
Receive a quote
We review the request and respond with clear pricing or the next step.
Agree the next step
We confirm availability and agree any visit or work date with you.
Work delivered
Job-specific qualifications, registrations and insurance are confirmed first.
Follow-up
Workmanship has 12-month cover, subject to the published terms.
House Extension Guides & Resources
House Extension Cost London 2026 — NW London Price Guide
House extension costs in London 2026. Single-storey, double-storey, rear and side return extensions for NW3, NW6, NW8 properties. Detailed price breakdown.
costsParty Wall Survey Cost London 2026 — NW London Guide
Party wall surveyor fees in London 2026. Who pays, what is included, and typical costs for NW3, NW6, NW8 loft conversions and extensions.
planningHome Extension Planning Guide — NW London 2026
Planning guide for home extensions in NW London. Single-storey, double-storey, side and rear extensions. Permitted Development vs full planning for NW3, NW6, NW8.
processHouse Extension Process — Step-by-Step NW London Guide
Step-by-step guide to building a house extension in NW London. Design, planning, groundworks, structure, and fit-out. What to expect at each stage.
processOpen-Plan Living Conversions — NW London Process Guide
How to create open-plan living in an NW London home. Structural wall removal, RSJ beams, planning, and what open-plan conversion costs. Expert guide.
processGarden Office Studio Guide — NW London Planning & Build Process
How to build a garden office or studio in NW London. Permitted Development rules, insulation, electrics, and planning in conservation areas. Complete guide.
In-depth reading
Need help with a property?
Submit a one-time request in the browser. Install the app later if you want easier repeat requests and tracking.