Hampstead & North London · In-house delivery
Kitchen Renovation & Refurbishment in North & North West London
Kitchen renovation and kitchen refurbishment across Hampstead and London — joinery, worktops, plumbing, electrics and finishes coordinated in-house.
Kitchen renovation briefs cover full refits, reconfigurations and fit-only packages. Joinery, worktops, plumbing, electrics, tiling and decoration are sequenced in one written programme — not a marketplace of disconnected traders.
- Kitchen Renovation
- Kitchen Refurbishment
- Kitchen Refit
- Full Kitchen Renovation
- Bespoke Kitchen
- Kitchen Design
- Worktops
- Kitchen Tiling
Covering 47 London areas
What do you need?
Choose the job. Each one says what to send, and whether to call.
A new layout
Mark appliance positions on a photograph. Say whether the soil pipe can stay.
Send this in a briefUnits in the same place
Photograph each elevation and say what is being kept.
Send this in a brief
Begin with how the kitchen must work
A kitchen renovation brief should describe daily use before it describes a door style. Note the number of users, cooking habits, dining needs, storage problems, appliance preferences and whether the room connects to a garden or living space. Distinguish a like-for-like refit from a layout change, an open-plan alteration or a kitchen delivered within wider building work. Those routes require different surveys and responsibilities. A clear priority list also helps resolve trade-offs between circulation, worktop length, daylight, storage and the budget available for the accepted scope.
Fix the appliance and service strategy before manufacture
The appliance schedule drives electrical loads, water connections, wastes, ventilation and cabinet geometry. Identify exact models where possible, their supply responsibility and any acceptable alternative. Islands and peninsulas need service routes that work with the actual floor construction; a preferred position does not create a safe route automatically. Hot-water demand, radiator changes and underfloor heating should be coordinated with the wider system. First-fix information must be agreed before joinery is ordered, otherwise later changes can compromise cabinets, worktops or compliance.
Design extraction around a viable discharge route
Extraction choices depend on cooking intensity, room arrangement, duct length, noise, replacement air and where a discharge can lawfully and practically terminate. Recirculation and external extraction are different propositions. In flats or on sensitive elevations, freeholder or consent checks may apply to a new grille or duct. The brief should show the intended hood, ceiling voids and external context rather than assuming an outlet is available. Ventilation decisions also need to align with other combustion, heating or whole-house systems at the property.
Separate structural change from kitchen fitting
Removing a wall, widening an opening or altering a rear elevation is a building project as well as a kitchen project. The design route may need measured drawings, structural calculations, temporary-work planning and address-specific planning or Building Control checks before a construction quote is settled. The kitchen package then coordinates against the accepted opening and finished levels. Keeping structure distinct from cabinetry makes allowances, responsibilities and inspection points visible, while still allowing both packages to follow one controlled programme where that is appropriate.
Control joinery, worktops and finish decisions
A useful schedule names cabinet construction, door finish, ironmongery, internal storage, worktop material, upstands, splashbacks and interfaces with flooring and decoration. Samples should be reviewed under the intended lighting rather than treated as exact from a screen. Templates for stone or other fitted surfaces follow stable units and verified appliance positions. The quote should state what is bespoke, standard, provisional or client-supplied. It should also record replacement rules if a selected item becomes unavailable before procurement.
Plan delivery and occupation as part of the build
Kitchen work affects food preparation, water, power, circulation and waste, so occupation needs an explicit plan. Confirm whether the household remains, which temporary facilities are realistic, and when isolations can occur. Flats may add lift reservations, porter rules, corridor protection and restricted delivery windows; houses may have narrow stairs or limited rear access. Large panels, appliances and worktops require routes checked before ordering. Dust control, protection and daily close-down expectations belong in the written method rather than informal assumptions.
Make the kitchen quote follow the dependency chain
A comparable kitchen quote separates design, enabling work, structure, first fix, joinery, worktops, appliances, flooring, decoration, protection, waste and making good. Provisional sums should identify the unknown they cover. The programme should show decision and inspection points before manufacture, close-up and templating; a single completion promise hides those dependencies. Handover can include applicable certificates, appliance and finish information, care instructions, photographs of agreed concealed services, and a snagging schedule. The accepted written scope determines payment stages and completion.
Why Choose Hampstead On Demand?
- ✓Reviewed by the operating team, not a provider marketplace
- ✓The price basis is confirmed before planned work
- ✓A written quote or confirmed call-out terms before work
- ✓Postcode and property details considered during triage
- ✓Relevant trade credentials checked before work
Kitchen renovation brief checklist
- Full postcode, property type, tenure, occupancy and access constraints
- Measured plan if held and photographs of every wall, floor and ceiling
- Daily-use priorities, storage needs, dining needs and circulation problems
- Preferred appliances with model references and supply responsibility
- Known electrical, gas, water, waste, heating or extraction constraints
- Any structural drawings, surveys, approvals or managing-agent rules held
- Finish references and decisions that are fixed versus still exploratory
Kitchen coordination decisions
- Does structure or investigation need resolving before joinery design?
- Are appliance loads, service routes and extract termination viable?
- Which dimensions must be verified before units or worktops are ordered?
- What remains provisional and how will substitutions be approved?
- How will occupation, protection, deliveries and isolations be managed?
- Which certificates, schedules and care records are expected at handover?
Independent guidance relevant to this brief
These external sources explain safety, regulatory or consumer context. They do not confirm availability, diagnose the property or replace job-specific professional advice.
- Planning Portal: kitchen and bathroom Building Regulations
Direct introductory guidance on when drainage, ventilation, structure, electrical or fire-safety work can require approval in England.
- GOV.UK: Approved Document F
Current government landing page for dwelling ventilation guidance and applicable editions in England.
- GOV.UK: Approved Document P
Statutory guidance on electrical design, installation, inspection, testing and notification in dwellings.
Local decision context
Kitchen Renovation briefs in North & North West London
Read the local property and access context for your brief. Availability is confirmed after we review the postcode and job details.
Featured kitchen renovation neighbourhoods
Choose the page for your exact neighbourhood where one exists. Availability is always confirmed from your postcode.
Local service coverage
Kitchen Renovation by area
All kitchen renovation neighbourhood links are shown in the priority or featured section above. They are not repeated here.
- North & North West London
- Central London
- West London
- South West London
- South London
- South East London
- East London
To discuss work, start a project brief with photos and details.
Other neighbourhoods can still receive a brief through the portal; dedicated pages are added as our coverage there grows.
Looking for another postcode? Browse all areas or use the coverage checker.
Frequently Asked Questions
How do I ask for a kitchen renovation?▼
Where can I ask for a kitchen renovation?▼
Who carries out the work?▼
How is the price agreed?▼
Do I need a visit before you can quote?▼
What should I send about a flat or a managed building?▼
Does this work need Building Control?▼
Can I submit a kitchen renovation brief in London?▼
How is kitchen renovation work priced?▼
How long does a kitchen renovation take in London?▼
Do you supply the kitchen units or just fit them in London?▼
How much does a kitchen refurbishment cost in London?▼
More topics: all FAQs · quotes & payments · service areas · renovations
Related Services
Bathroom Renovation
Bathroom renovation and bathroom refurbishment for Hampstead, NW London and wider premium London — wet rooms, en-suites and full refits with plumbing, tiling and electrics coordinated in-house.
Full Refurbishment
House refurbishment and full property renovation across Hampstead and London — strip-out to fit-out with all trades coordinated in-house.
Carpenter
Carpentry and joinery across Hampstead and London — doors, fitted furniture and timber repairs after the brief is reviewed.
Plumber
Domestic plumbing across Hampstead and London — leaks, taps, bathroom fittings, radiators and waste, scoped in writing.
How the brief works
Tell us what you need
Describe your project or issue using our online form or by phone.
Receive a quote
We review the request and respond with clear pricing or the next step.
Agree the next step
We confirm availability and agree any visit or work date with you.
Work delivered
Job-specific qualifications, registrations and insurance are confirmed first.
Follow-up
Workmanship has 12-month cover, subject to the published terms.
People Also Ask About Kitchen Renovation
Can a toilet open directly into a kitchen?▼
Not without a door between them. Approved Document G paragraph 4.11 states that in England a place containing a sanitary convenience, or its associated hand washing facilities, should be separated by a door from any place used for the preparation of food, including a kitchen. In a dwelling, a room holding both a WC and a hand basin needs no separate lobby.
Source: Approved Document G, paragraph 4.11 and Diagrams 2 and 3, GOV.UK
Do I have to replace the extractor fan when refurbishing a kitchen?▼
If there is already one, yes. The Planning Portal states that in England, when refurbishing a kitchen or bathroom you must ensure any existing extract ventilation is retained or replaced, and that if there is no existing ventilation system you need not provide one, though you may. Any new kitchen, bathroom, utility room or toilet should be given extract ventilation.
Source: Planning Portal, Kitchens and bathrooms: need for additional ventilation (England)
Do I have to tell my water company before installing new water fittings?▼
For certain fittings, yes. In England and Wales, regulation 5 of the Water Supply (Water Fittings) Regulations 1999 requires notice to the water undertaker and its consent before installing a bath holding more than 230 litres, a pump or booster drawing more than 12 litres per minute, or a garden watering system not designed to be operated by hand. Consent is deemed granted unconditionally if the undertaker does not reply within ten working days.
Source: Water Supply (Water Fittings) Regulations 1999, regulation 5, legislation.gov.uk
Do I need building regulations approval to refit a kitchen?▼
Generally no, for the units and fittings alone. The Planning Portal states that in England, work to refit a kitchen with new units and fittings does not generally require building regulations approval, although drainage or electrical works that form part of the refit may require approval. Building control for the area confirms what a particular job needs.
How powerful does a kitchen extractor fan have to be under building regulations?▼
A kitchen needs an intermittent extract rate of at least 30 litres per second where a cooker hood extracts to the outside, and 60 litres per second where there is no cooker hood or the hood does not extract outside. Table 1.1 of Approved Document F, Volume 1 sets these figures for England; the 2021 edition took effect on 15 June 2022.
Source: Approved Document F, Volume 1 (2021 edition), Table 1.1, GOV.UK
What size waste pipe and trap does a kitchen sink need?▼
A kitchen sink needs a 40mm trap with a 75mm depth of water seal. Approved Document H, Table 1 sets this for England. Paragraph 1.15 adds that a pipe serving a single appliance should have at least the same diameter as that appliance's trap, and paragraph 1.3 says every trap should retain at least 25mm of water under working and test conditions.
Source: Approved Document H (2015 edition), Table 1 and paragraphs 1.3 and 1.15, GOV.UK
Who is legally allowed to install a gas hob in a house?▼
Only a gas business on the Gas Safe Register. Regulation 3(3) of the Gas Safety (Installation and Use) Regulations 1998, which applies in Great Britain, prohibits an employer or self-employed person from working on a gas fitting unless they are a member of a class of persons approved by the Health and Safety Executive, and the HSE states that such a business must be on the Gas Safe Register. Regulation 3(1) separately requires competence.
Source: Gas Safety (Installation and Use) Regulations 1998, regulation 3(1) and 3(3), legislation.gov.uk
Kitchen Renovation Guides & Resources
Kitchen Renovation Cost London 2026 — NW London Price Guide
How much does a kitchen renovation cost in London in 2026? Budget, mid-range and premium prices for NW3, NW6, NW8. Includes supply, fit, plumbing and electrics.
processKitchen Renovation Process — Step-by-Step NW London Guide
Step-by-step kitchen renovation guide for NW London homes. Design, strip-out, electrics, plumbing, units, worktops, and appliances. How long it takes.
processOpen-Plan Living Conversions — NW London Process Guide
How to create open-plan living in an NW London home. Structural wall removal, RSJ beams, planning, and what open-plan conversion costs. Expert guide.
compareKitchen Worktops Compared — Granite, Quartz, Marble & Timber
Comparing kitchen worktops for NW London homes. Granite vs quartz vs marble vs timber. Durability, cost, maintenance and aesthetics compared.
compareKitchen Layouts Compared — NW London Open-Plan & Galley Options
Comparing kitchen layouts for NW London homes. L-shape, galley, island, and open-plan kitchens. Which layout works best for Victorian terraced properties.
homeownerPreparing Your NW London Home for Sale — Renovation ROI Guide
How to prepare an NW London property for sale. Which renovations deliver the best ROI, what to prioritise, and how to maximise your sale price in NW3, NW6, NW8.
In-depth reading
Cost guide
Kitchen Renovation Cost London 2026 — NW London Price Guide
Cost guide
Bespoke Kitchen Cost NW London 2026 — Premium Kitchen Price Guide
Ultimate guide
Renovating a Home in a Camden Conservation Area
Ultimate guide
Renovating in a Barnet Conservation Area: An Owner’s Guide
Ultimate guide
Conservation Area Renovation in Haringey
Brief our team about kitchen renovation
Send the address, the trade and what you need done. The team confirms availability and the next step from the office at 250 Finchley Road.
Need help with a property?
Submit a one-time request in the browser. Install the app later if you want easier repeat requests and tracking.