Case studyBelsize Park, NW3Completed April 2025

Kitchen Renovation, Belsize Park

A full kitchen renovation in a five-bedroom Edwardian semi-detached house in Belsize Park, replacing an outdated kitchen with a bespoke in-frame painted kitchen, Gaggenau appliances, Calacatta marble worktops, and a new island with seating. Completed in 8 weeks.

A published record of completed work, used to scope similar briefs. Every project is delivered in-house by Hampstead Renovations or Hampstead Maintenance — never a marketplace.

Project Type

Kitchen Renovation

Duration

8 weeks

Recorded Value

£58,000

The duration and value describe this completed project. Your quote will reflect the property, agreed scope and current costs.

Project photographs

Prime North London residential refurbishment by Hampstead Renovations and Hampstead On Demand
Completed workA Prime North London residential refurbishment by Hampstead Renovations. This record does not include a publication-approved photograph of the job.

Brief our team on a similar project

Send the address, the trade and what you need done. The team confirms availability and the next step from the office at 250 Finchley Road.

Delivered in-house by Hampstead Maintenance or Hampstead Renovations (£5M public liability, £10M employers' liability & contractors' all risks cover). Never a third-party lead marketplace. For urgent gas leaks call 0800 111 999 first; for urgent make-safe triage call 020 7101 3168.

The brief and property

The existing kitchen had a structural column in an awkward position near the intended island location. The column could not be moved without significant structural works beyond the project budget. The original quarry tile floor had several cracked and hollow sections, requiring full removal and a new concrete subfloor before the engineered oak could be laid. The boiler was in the kitchen and needed to be relocated to a utility cupboard.

Work completed

Our joiner incorporated the structural column into the island design — the column became the island's end detail, clad in matching painted hardwood, and the island top was corbelled over it. The quarry tiles were fully removed and a new 75mm reinforced concrete slab laid. The boiler was relocated to a purpose-built utility cupboard in the corridor. The project remained within budget throughout.

Results

  • Structural column incorporated into island as architectural feature
  • New 75mm concrete slab — level and flat for engineered oak installation
  • Boiler relocated to purpose-built utility cupboard
  • Bespoke in-frame kitchen — Farrow & Ball Off-Black
  • Calacatta marble worktops — mitred edge to island
  • Gaggenau Series 200 integrated appliances throughout
  • Engineered oak herringbone floor throughout kitchen

Key Features

  • Structural column incorporated as island end feature
  • Bespoke in-frame painted kitchen — Off-Black
  • Gaggenau Series 200 appliances throughout
  • Calacatta marble worktops — honed finish
  • Engineered oak herringbone floor
  • Quooker boiling water tap and BRITA filtered cold

Specification

ItemSpecification
Kitchen cabinetryBespoke in-frame painted hardwood, Farrow & Ball Off-Black No.57, soft-close fittings
WorktopsCalacatta Gold marble, 30mm, honed and sealed, mitred edge to island
AppliancesGaggenau BO470612 oven, BM450100 microwave, VI414111 induction, DF481142 dishwasher
FlooringKahrs engineered oak herringbone, 70×400mm, in Sorrento colourway, UV oiled
TapQuooker Fusion Pro3 boiling water tap, matte black, with BRITA filter unit
Column claddingPainted hardwood panels matching kitchen door profile, matching shadow gap detail

Interested in a similar project?