Hampstead & North London · In-house delivery
Plasterer in North & North West London — Skimming, Dry-Lining & Cornice Repair
Plastering across Hampstead and London — skimming, dry-lining and period cornice repair after surfaces are assessed.
Plastering briefs cover skimming, dry-lining, bonding and cornice repair. Active moisture should be investigated before finishing coats. Lime-based systems may be appropriate on solid period walls and are confirmed in the written scope.
- Plasterer
- Skimming
- Dry-Lining
- Cornice Repair
- Bonding
- Period Plasterwork
- Ceiling Repair
Covering 78 London areas
What do you need?
Choose the job. Each one says what to send, and whether to call.
Skimming
Tell us you need skimming, and send photographs of the existing arrangement. The scope is confirmed in writing.
Send this in a briefDry-Lining
Tell us you need dry-lining, and send photographs of the existing arrangement. The scope is confirmed in writing.
Send this in a briefCornice Repair
Tell us you need cornice repair, and send photographs of the existing arrangement. The scope is confirmed in writing.
Send this in a briefBonding
Tell us you need bonding, and send photographs of the existing arrangement. The scope is confirmed in writing.
Send this in a brief
Identify the substrate before choosing a plaster system
A plastering brief should record whether the surface is plasterboard, gypsum plaster, lime plaster, render, masonry, lath, painted finish or an unknown layered build-up. Photograph whole walls and ceilings as well as cracks, hollows, blown areas and previous patches. Skimming, bonding, overboarding, dry-lining and traditional repair solve different problems. A smooth-looking sample area does not establish adhesion across a room. The accepted method should follow substrate condition, suction, movement, thickness and intended finish rather than defaulting every wall to a thin gypsum skim.
Resolve active moisture before closing the surface
Staining, salts, soft plaster, mould or repeated failure can indicate a roof, plumbing, drainage, condensation or penetrating-moisture problem. Plaster replacement does not remove the cause. The brief should state whether the source has been identified and repaired, how dryness is being assessed and whether further investigation is required. Damp-proofing, roofing, plumbing and ventilation can sit on the critical path before finishes. A decorator’s stain block or a harder plaster is not evidence that the wall is ready. Where moisture remains unexplained, diagnosis and remedial work should be separate from the final plaster scope.
Choose lime, gypsum or board from the fabric evidence
Traditional solid walls and historic plaster can behave differently from modern cavity construction and plasterboard. Lime-based materials may be appropriate where compatibility, vapour movement and retained fabric require them, while gypsum and board systems may suit other sound backgrounds. Material choice should follow the surveyed wall and project requirements, not an assumption that every period property needs one recipe or that modern plaster is always suitable. The proposal should identify coats, reinforcement, beads, junctions and finish and explain any trial area. Listed or protected fabric may also require an address-specific conservation decision.
Treat cracks and movement as evidence, not filling work
Record crack width, direction, location, recurrence and any relationship with openings, ceilings or previous alterations. Fine stable surface cracking can belong in local preparation, but stepped, widening, displaced or repeatedly returning cracks may require building or structural assessment before plaster is removed or replaced. Covering a crack with mesh does not establish its cause. The plastering scope should state which cracks are considered decorative, what local reinforcement is proposed and which conditions trigger referral. Any engineer’s detail, movement-joint requirement or repair sequence must be incorporated before the finish coat hides the background.
Coordinate boards, fire, acoustic and service requirements
Dry-lining and ceiling work can affect fire resistance, sound separation, thermal build-up, room dimensions, fixings and access to services. Identify board type, layers, framing or adhesive method, junctions, openings and required performance from the accepted design. Penetrations, recessed fittings and service routes need coordination before boarding. In flats, separating walls and ceilings can form part of a wider building strategy that a generic plastering page cannot determine. Electrical, plumbing and structural alterations should be completed and inspected at the correct stage rather than cut informally through newly finished work.
Control gypsum, silica and general construction dust
HSE notes that sanding taped and covered plasterboard joints can generate high levels of gypsum dust and advises reducing sanding and using suitable on-tool extraction where it is needed. Removing old plaster, chasing, mixing and preparing masonry can create other dust and debris risks requiring task-specific assessment. The method should isolate occupied areas, control dust at source, use suitable cleaning and manage waste rather than relying on dry sweeping. Suspect asbestos-containing coatings, boards or textured finishes should not be disturbed until the appropriate information or assessment is available.
Sequence plastering with services, joinery and decoration
Before plastering starts, confirm which chases, first-fix services, structural repairs, windows, doors and wet trades must be complete. Protect retained floors, joinery and fittings and identify straightness or profile tolerances that matter to later cabinets, tiling or skirtings. Drying depends on material, thickness, substrate, ventilation and conditions, so decoration dates should follow the accepted system rather than a universal promise. Forced drying or premature coating can create problems. The programme should also allow for inspection of prepared backgrounds before they disappear behind boards or finish coats.
Compare plastering proposals by preparation and finish
A comparable quotation lists rooms and elevations, removal extent, background preparation, repairs, beads, mesh, boards, coats, profiles, protection, access, waste and exclusions. It should state which areas are provisional pending removal and how unexpected loose material or concealed services are handled. The specified finish should be appropriate for the next trade, not described by an undefined promise of perfection on irregular historic fabric. Handover should identify completed areas, drying and decoration information, any retained movement or substrate limitations and the written snagging position before other finishes obscure the work.
Why Choose Hampstead On Demand?
- ✓Reviewed by the operating team, not a provider marketplace
- ✓The price basis is confirmed before planned work
- ✓A written quote or confirmed call-out terms before work
- ✓Postcode and property details considered during triage
- ✓Relevant trade credentials checked before work
Plastering assessment brief
- Room and elevation schedule with wide and close photographs
- Known substrate, previous coatings, boards, lath or historic plaster
- Crack pattern, hollow areas, staining, salts, mould or repeated failures
- Evidence that roof, plumbing, drainage or condensation causes were addressed
- Drawings or requirements for fire, acoustic, thermal or structural work
- First-fix services, joinery, tiling and decoration dependencies
- Occupancy, dust separation, access and retained-finish protection
Plaster system and readiness checks
- Is the substrate sound, compatible and sufficiently dry for the method?
- Does movement or cracking require investigation before finishing?
- Which lime, gypsum, board, mesh, bead and coat build-up is proposed?
- Are fire, acoustic, thermal and service penetrations coordinated?
- How are dust, old coatings and suspect materials controlled?
- Which opening-up quantities and repairs remain provisional?
- What drying, decoration and snagging information forms the handover?
Independent guidance relevant to this brief
These external sources explain safety, regulatory or consumer context. They do not confirm availability, diagnose the property or replace job-specific professional advice.
- HSE: plasterboard-joint sanding dust
Official task guidance on reducing and controlling gypsum dust generated while sanding plasterboard joints.
- HSE: construction-dust guidance
Official overview of assessing and controlling silica, non-silica and other construction dust risks.
Local decision context
Plasterer briefs in North & North West London
Read the local property and access context for your brief. Availability is confirmed after we review the postcode and job details.
Featured plasterer neighbourhoods
Choose the page for your exact neighbourhood where one exists. Availability is always confirmed from your postcode.
Local service coverage
Plasterer by area
Browse dedicated plasterer pages for every area we list. Availability is confirmed after reviewing the postcode and brief.
- North & North West London
To discuss work, start a project brief with photos and details.
Central London
Find plasterer guidance for your neighbourhood in Central London. Scope and availability are confirmed after reviewing your request.
West London
Find plasterer guidance for your neighbourhood in West London. Scope and availability are confirmed after reviewing your request.
South West London
Find plasterer guidance for your neighbourhood in South West London. Scope and availability are confirmed after reviewing your request.
South London
Find plasterer guidance for your neighbourhood in South London. Scope and availability are confirmed after reviewing your request.
South East London
Find plasterer guidance for your neighbourhood in South East London. Scope and availability are confirmed after reviewing your request.
East London
Find plasterer guidance for your neighbourhood in East London. Scope and availability are confirmed after reviewing your request.
Other neighbourhoods can still receive a brief through the portal; dedicated pages are added as our coverage there grows.
Looking for another postcode? Browse all areas or use the coverage checker.
Frequently Asked Questions
How do I ask for a plasterer?▼
Where can I ask for a plasterer?▼
Who carries out the work?▼
How is the price agreed?▼
Do I need a visit before you can quote?▼
What should I send about a flat or a managed building?▼
Does this work need Building Control?▼
Can I submit a plasterer brief in London?▼
How is plasterer work priced?▼
Can you repair Victorian cornices in London?▼
Do you skim newly boarded rooms in London?▼
More topics: all FAQs · quotes & payments · service areas
Related Services
Painter & Decorator
Professional painting and decorating for interiors and exteriors across Hampstead and London — preparation-led finish work on period and later stock.
Builder
Building work across Hampstead and London — structural alterations, brickwork and groundwork after competence is confirmed for the accepted scope.
Full Refurbishment
House refurbishment and full property renovation across Hampstead and London — strip-out to fit-out with all trades coordinated in-house.
Damp Proofing
Damp assessment and treatment across Hampstead and London — penetrating damp, condensation and related moisture paths after cause review.
How the brief works
Tell us what you need
Describe your project or issue using our online form or by phone.
Receive a quote
We review the request and respond with clear pricing or the next step.
Agree the next step
We confirm availability and agree any visit or work date with you.
Work delivered
Job-specific qualifications, registrations and insurance are confirmed first.
Follow-up
Workmanship has 12-month cover, subject to the published terms.
People Also Ask About Plasterer
Can you replaster a wall in a listed building?▼
Only with listed building consent where the work would affect the building's special interest. In England, section 7 of the Planning (Listed Buildings and Conservation Areas) Act 1990 prohibits alteration of a listed building in any manner which would affect its character as a building of special architectural or historic interest. Whether a given wall is caught must be confirmed with the local planning authority.
Source: Planning (Listed Buildings and Conservation Areas) Act 1990, section 7, legislation.gov.uk
Do you have to check for asbestos before taking down a ceiling?▼
Yes. Regulation 5 of the Control of Asbestos Regulations 2012 states that an employer must not carry out demolition, maintenance or other work which exposes employees to asbestos unless a suitable and sufficient assessment of whether asbestos is present has been carried out. Where there is doubt, the material must be presumed to contain asbestos other than chrysotile alone.
Source: Control of Asbestos Regulations 2012, regulation 5, legislation.gov.uk
Does Artex contain asbestos?▼
Textured decorative coatings can contain asbestos. The Health and Safety Executive treats them as asbestos-containing materials in its non-licensed work guidance: drilling them for fixtures and fittings, or working on small areas using suitable dust-reducing methods, is listed as non-licensed work. A risk assessment and appropriate controls are still required under the Control of Asbestos Regulations 2012.
Source: Non-licensed work with asbestos, Health and Safety Executive
How old does a building have to be to contain asbestos?▼
If the building was built or refurbished before 2000, assume that there is asbestos in it. That is the wording the Health and Safety Executive uses in its duty to manage guidance. Asbestos can be visible or hidden within the building fabric, for example inside wall cavities or fire doors, so presence is established by survey.
Source: The duty to manage asbestos in buildings, Health and Safety Executive
What is the legal limit for asbestos fibres in the air?▼
The control limit under the Control of Asbestos Regulations 2012 is 0.1 asbestos fibres per cubic centimetre of air, as stated by the Health and Safety Executive. A separate figure of 0.6 fibres per cubic centimetre, measured over a ten-minute period, is the control limit for lower-risk work that can be done without a licence.
Source: Asbestos FAQs, Health and Safety Executive
What training is required to work near asbestos?▼
Regulation 10 of the Control of Asbestos Regulations 2012 requires employers to ensure that anyone liable to be exposed to asbestos receives adequate information, instruction and training. It must cover the properties of asbestos and its effects on health, the types of products likely to contain asbestos, safe work practices and control measures, and be given at regular intervals.
Source: Control of Asbestos Regulations 2012, regulation 10, legislation.gov.uk
Who is legally responsible for managing asbestos in a building?▼
Regulation 4 of the Control of Asbestos Regulations 2012 places the duty to manage asbestos in non-domestic premises on the dutyholder: anyone with a contractual or tenancy obligation for maintenance or repair, or otherwise in control of the premises. They must ensure a suitable and sufficient assessment of whether asbestos is or is liable to be present is carried out.
Source: Control of Asbestos Regulations 2012, regulation 4, legislation.gov.uk
Plasterer Guides & Resources
Plastering Cost London 2026 — NW London Plasterer Prices
Plastering costs in London 2026. Per room, per square metre and whole house plastering prices for NW3, NW6, NW8. Lime plaster, skim and dry lining.
processPeriod Property Renovation Guide — NW London Victorian Homes
How to renovate a Victorian or Edwardian period property in NW London. Materials, methods, planning rules, and specialist trades for heritage properties.
compareTypes of Damp in NW London Homes — Diagnosis & Treatment Guide
Guide to identifying damp types in NW London period properties. Rising damp vs penetrating damp vs condensation. Correct treatment for each type.
tradesPainting Preparation Guide — NW London Period Properties
How to prepare surfaces for painting in NW London period properties. Plaster preparation, filling, priming, and achieving a professional finish.
tradesPlaster Types Guide — Lime, Gypsum & Dry Lining for NW London Homes
Guide to plaster types for NW London period properties. Lime plaster vs gypsum skim vs dry lining — when to use each and why lime matters for Victorian walls.
areaVictorian Houses NW London — Renovation & Maintenance Guide
Complete guide to renovating and maintaining Victorian houses in NW London. Construction types, common issues, materials, and period-appropriate renovation.
In-depth reading
Brief our team about plasterer
Send the address, the trade and what you need done. The team confirms availability and the next step from the office at 250 Finchley Road.
Need help with a property?
Submit a one-time request in the browser. Install the app later if you want easier repeat requests and tracking.