Case studyWest Hampstead, NW6Completed March 2025

Full Victorian Terrace Refurbishment, West Hampstead

A complete gut-and-rebuild refurbishment of a neglected four-bedroom Victorian terraced house in West Hampstead. The property had not been significantly updated since the 1970s. The project included structural works, full rewiring, replumbing, new kitchen and three bathrooms, insulation throughout, and complete redecoration. Completed in 18 weeks.

Background photography is illustrative of our North London portfolio work, not a claim that it shows this exact property.

A published record of completed work, used to scope similar briefs. Every project is delivered in-house by Hampstead Renovations or Hampstead Maintenance — never a marketplace.

Project Type

Full House Refurbishment

Duration

18 weeks

Project Value

£165,000

The Challenge

The property was occupied and then a probate sale — the solicitor required a detailed condition survey before works could begin, and the estate needed to be vacated during the programme. The original 1970s kitchen extension had subsidence issues that were not flagged in the original survey, adding structural remediation to the scope. The timeline was non-negotiable due to a sale completion date.

Our Solution

We produced a comprehensive pre-works condition survey including a structural engineer's report within 10 days, satisfying the solicitors and insurers. The extension subsidence required underpinning of two sections — we brought in a specialist subcontractor and managed it within the original timeline by advancing other programme elements. A project manager maintained daily coordination across seven separate trade packages.

Results

  • Full structural survey and engineer's report delivered within 10 days
  • Extension subsidence rectified with minimal programme impact
  • New kitchen with quartz worktops, integrated appliances, island
  • Three new bathrooms with full tiling and sanitaryware
  • Full rewiring with NICEIC Part P certification
  • Full replumbing with new boiler and UFH ground floor
  • Property sold at asking price within two weeks of completion

Key Features

  • Structural remediation — extension underpinning
  • Full rewiring to 18th Edition standards
  • Full replumbing with Worcester Bosch boiler
  • Underfloor heating ground floor
  • Bespoke island kitchen with quartz worktops
  • Three fully tiled bathrooms
  • Lime plaster to original Victorian walls throughout

Specification

ItemSpecification
KitchenShaker-style painted units, Calacatta quartz worktops, Neff integrated appliances
Bathroom tiles (main)Large-format Lapicida natural limestone, heated towel rail, rain-head shower
BoilerWorcester Bosch Greenstar 8000 Life 30kW combi, A-rated
UFHWarmup wet system, ground floor throughout, 150mm reinforced screed
FlooringSolid engineered oak throughout ground floor; Amtico on first floor wet rooms
PlasteringLime plaster skim to original brick walls; Thistle hardwall to blockwork

Interested in a similar project?

Submit a private brief with photos for a similar scope. Fit and capacity are confirmed case by case for in-house delivery.