Skip to main content
Case studySt John's Wood, NW8Completed March 2025

Mansard Loft Conversion, St John's Wood

A substantial mansard loft conversion on a five-bedroom stucco-fronted Victorian villa in St John's Wood, adding two new bedroom suites at loft level. The project required Westminster City Council planning consent and careful structural design to work with the existing stucco facade and complex roof geometry.

A published record of completed work, used to scope similar briefs. Every project is delivered in-house by Hampstead Renovations or Hampstead Maintenance — never a marketplace.

Project Type

Mansard Loft Conversion

Duration

18 weeks

Recorded Value

£110,000

The duration and value describe this completed project. Your quote will reflect the property, agreed scope and current costs.

Project photographs

Prime North London residential refurbishment by Hampstead Renovations and Hampstead On Demand
Completed workA Prime North London residential refurbishment by Hampstead Renovations. This record does not include a publication-approved photograph of the job.

Brief our team on a similar project

Send the address, the trade and what you need done. The team confirms availability and the next step from the office at 250 Finchley Road.

Delivered in-house by Hampstead Maintenance or Hampstead Renovations (£5M public liability, £10M employers' liability & contractors' all risks cover). Never a third-party lead marketplace. For urgent gas leaks call 0800 111 999 first; for urgent make-safe triage call 020 7101 3168.

The brief and property

Westminster City Council's planning policies for St John's Wood Conservation Area are among the most stringent in London. The existing roof had a complex multi-pitch geometry with a valley and a projecting bay, making a straightforward mansard form impossible. Any alteration visible from the public realm was subject to detailed design review. The villa was occupied throughout, with a family in residence.

Work completed

We worked with an architect specialising in Westminster conservation area applications to design a bespoke mansard form that followed the existing roof geometry rather than imposing a standard box. Zinc standing-seam cladding was selected over lead for the larger panels as it better suited the stucco villa character. Westminster approved the application in 10 weeks. A detailed site-management plan ensured the family's routine was disrupted as little as possible.

Results

  • Westminster planning approval in 10 weeks — no objections from conservation officer
  • Two new bedroom suites created at loft level, totalling 52m²
  • Principal suite with dressing room, en-suite, and Juliet balcony
  • Secondary suite with en-suite shower room
  • Zinc standing-seam cladding — sympathetic to stucco villa character
  • Project completed with family in residence throughout

Key Features

  • Westminster conservation area planning consent
  • Bespoke mansard form following complex roof geometry
  • Standing-seam zinc cladding to main mansard faces
  • Two en-suite bedroom suites at loft level
  • Juliet balcony with slim-section frameless glass balustrade
  • Internorm triple-glazed dormer windows

Specification

ItemSpecification
Mansard claddingRHEINZINK standing-seam zinc, pre-weathered graphite grey, 0.7mm gauge
Dormer windowsInternorm HF 310 triple-glazed timber-aluminium, powder-coated dark grey
Structural frameBespoke fabricated steel portal frame, designed around complex existing geometry
En-suite (principal)Lapicida Calacatta marble wall and floor tiles, Hansgrohe Axor fixtures, UFH
En-suite (secondary)Porcelanosa large-format stone-effect, thermostatic shower, heated towel rail
StaircaseBespoke oak and steel open-tread staircase with glass balustrade

Interested in a similar project?

Submit a private brief with photos for a similar scope. Fit and capacity are confirmed case by case for in-house delivery.