Project Type
Full House Refurbishment
Duration
20 weeks
Project Value
£175,000
The Challenge
The property had a long history of ad hoc repairs — a mix of copper, plastic, and lead pipework throughout, two different fuse-box systems on different circuits, and insulation that had settled to near zero effectiveness. Coordinating the structural survey, strip-out, and sequenced reinstatement of services across a 20-week programme with a fixed completion date required intensive project management.
Our Solution
A dedicated project manager ran the project with weekly written progress reports to the client. A sequencing matrix was produced in week one, with all seven trade packages given defined access windows. All pipework and wiring was fully replaced. The two fuse boxes were decommissioned and a single new 18th Edition compliant consumer unit installed. Attic insulation was upgraded to 270mm of blown mineral wool.
Results
- ✓Full pipework replacement — copper throughout, new bathroom risers
- ✓Full rewiring to 18th Edition — single new consumer unit
- ✓Bespoke kitchen with quartz worktops and Neff appliances
- ✓Three new bathrooms with Porcelanosa tiling and Hansgrohe fittings
- ✓Loft insulation upgraded to 270mm blown mineral wool
- ✓Property sold for £85,000 above asking price within one week
- ✓Full Building Regulations compliance — all certifications issued
Key Features
- ✓Full rewiring and single new consumer unit
- ✓Full replumbing — copper throughout
- ✓Bespoke kitchen with island and quartz worktops
- ✓Three bathrooms — Porcelanosa and Hansgrohe throughout
- ✓Attic insulation upgraded to 270mm mineral wool
- ✓Dedicated project manager with weekly written reports
Specification
| Item | Specification |
|---|---|
| Kitchen | Bespoke painted Shaker, Quartz Eternal Calacatta worktops, Neff integrated appliances |
| Bathrooms | Porcelanosa Marmol Calacatta tiles, Hansgrohe Croma Select shower, Duravit WC and basin |
| Boiler | Worcester Bosch Greenstar 8000 Life 30kW combi, A-rated, 10-year warranty |
| Consumer unit | Hager Visi 18th Edition consumer unit, RCBO-protected, full Part P certification |
| Loft insulation | Knauf Earthwool blown mineral wool, 270mm depth, vapour barrier below |
| Flooring | Engineered oak throughout ground floor; Karndean Korlok LVT to bathrooms and landing |